In between bouncing Nora around the past few weeks, I've been able to sneak in a little work on my new desk. I now have both the desktop (a 30" x 60" x 1" phenolic resin surface from JHC Lab Resin) and its subframe (a 20 mm x 40 mm extrusion frame from 8020), and have partially assembled them to each other:
The subframe only attaches mechanically to the desktop in two places - one bolt in the middle of each of the long frame legs. I *think* I'm also going to use VHB tape between the frame and the desktop, but I'm holding off on that until I get a few more of the parts in & prepped.
I also received the shelf (which is 12" x 48" x 3/4") and all of the carbon fiber tubing. I'll be cutting the tubing to length with a diamond grit saw blade, and need to drill & tap a bunch of holes in the shelf still as well. I'm also planning on mounting my old Wilton Bullet vise to the desktop using some nut inserts, but I'll probably hold off on drilling more holes in the desktop until I get the whole thing together and use it for a few days.
I should be getting the printed parts back from Formlabs in the next week or so, and because of the way it assembles I should be able to get the desk put together really quickly once they arrive. Fun :)